Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Barrett, P S and Barrett, L C (2003) Research as a kaleidoscope on practice. Construction Management and Economics, 21(07), 755-66.

  • Type: Journal Article
  • Keywords: research; practice; policy; Kaleidoscopic Model; research typology
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619032000093314
  • Abstract:

    Insufficient attention is paid to the relationship between research and practice in construction. Those in industry want straightforward guidance, but inhabit a complex socially constructed world. As a result, they are often disappointed with the contribution of research, either because it is too theoretical or because the simple solutions suggested do not work. However, researchers have a valuable contribution to make owing to their opportunity for reflection, and it is proposed that this can be viewed in three different ways: as ’microscopes’, ’telescopes’ or ’periscopes’ on practice. Each of these views involves different epistemologies and methodologies, but combining the three approaches in a Kaleidoscopic Research Model will allow differences to thrive and synergies to be sought. Only then will an effective dialogue develop where research impacts solidly and continuously on the improvement of practice, while at the same time practice constantly challenges and refreshes research.

Cho, Y (2003) The organizational boundaries of housebuilding firms in Korea. Construction Management and Economics, 21(07), 671-80.

Dainty, A R J and Edwards, D J (2003) The UK building education recruitment crisis: a call for action. Construction Management and Economics, 21(07), 767-75.

Kaka, A P and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model (DYCAFF). Construction Management and Economics, 21(07), 693-705.

Perttula, P, Merjama, J, Kiurula, M and Laitinen, H (2003) Accidents in materials handling at construction sites. Construction Management and Economics, 21(07), 729-36.

Phua, F T T and Rowlinson, S (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: the case of Hong Kong. Construction Management and Economics, 21(07), 777-85.

Pongpeng, J and Liston, J (2003) A multicriteria model's survey: state of the art and some necessary capabilities of future models. Construction Management and Economics, 21(07), 665-70.

Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(07), 681-92.

Su, C-K, Lin, C-Y and Wang, M-T (2003) Taiwanese construction sector in a growing 'maturity' economy, 1964-1999. Construction Management and Economics, 21(07), 719-28.

Tam, C M, Fung, I W H, Yeung, T C L and Tung, K C F (2003) Relationship between construction safety signs and symbols recognition and characteristics of construction personnel. Construction Management and Economics, 21(07), 745-53.

Wanous, M, Boussabaine, A H and Lewis, J (2003) A neural network bid/no bid model: the case for contractors in Syria. Construction Management and Economics, 21(07), 737-44.

Zhi, M, Hua, G B, Wang, S Q and Ofori, G (2003) Total factor productivity growth accounting in the construction industry of Singapore. Construction Management and Economics, 21(07), 707-18.